The former Whiston Library Measured Survey

SEP were tasked with carrying out an Underground Utility Survey to BSI PAS128:2014 standards at the former Whiston Library.

Project

SEP were tasked with carrying out an Underground Utility Survey to BSI PAS128:2014 standards at the former Whiston Library.

Challenges

When looking to start construction work on any site it is vital that a utility survey is undertaken before the ground is broken. A utility survey helps ensure the safety of all people working on site. It also assists with design because it should reduce the amount of unknowns within the site and show existing services which may need diverting.
The utility survey information was key to the client and it was important that SEP hit deadlines set out at the start of the project so that there was no impact on the rest of the programme.

Results

The survey works were completed using ground penetrating radar and electro magnetic location. SEP were able to provide a comprehensive plan of all existing services in the area. Even with a tight deadline, SEP were able to surpass client expectations as evidenced by the testimonial below.

Testimonial

I just wanted to drop you a quick email and say thank you for your help with that GPR survey. The turnaround was incredible and all your guys were incredibly helpful when I needed assistance clarifying things – Roy especially. Please pass on my thanks to the team, very impressed and look forward to working with you more on future projects.

Categories Infrastructure
Measured Building Surveys
Topographical
Utility Surveys
Date February 2019
Survey Underground Utility Detection Surveys
Location Whiston
Delivery Format DWG
Works Duration 1 Week